Commercial HVAC · Hospitality 2025

IEEE 519 audit at a 5-star hotel

International hotel chain — Panamá Pacífico

US$35K
Investment avoided
10 days
Measurement period
✓ Compliant
IEEE 519 compliance
18
Events identified

Challenge

A 200-room hotel was reporting sporadic UPS trips and flicker in its LED lighting. Maintenance management suspected harmonics from the chillers and the pump VFDs. They needed an independent diagnosis before investing in filters.

Beiton solution

10-day Class A measurement with a Fluke 1777 at the main service entrance (480 V) and at the chiller panel. Analysis under IEEE 519-2022 and EN 50160 plus ITIC classification. Identification of the real source of the events.

Result

The report established that harmonics were NOT the origin — the root cause was transients from the utility supply at three specific times of day. We recommended only a local conditioner for the critical UPS units instead of the full active filter that had been budgeted. Investment avoided: ~US$35,000.

We had budgeted an active filter at USD 35,000. Beiton measured with their own Fluke 1777 and showed the problem was not on our side — they saved us the investment and proposed a targeted fix.
— Chief Engineer — International hotel chain

Products used

  • Fluke 1777 (Beiton instrumentation)
  • 22-section Word report

Services delivered

  • Power Quality Analysis
  • IEEE 519-2022 consulting

Have a similar project?

Every case is different, but the method is the same. Tell us your situation and we will propose a concrete path forward.

Propose my project