All services // Turnkey integration

Industrial Automation Projects

Our core practice. We automate industrial processes end to end — water pumping and treatment, refrigeration, servo-driven machines, compressors, HVAC, batch processes and more. We integrate PLCs, HMIs, variable frequency drives (VFDs), instrumentation and communications under a single technical scope, from engineering through commissioning under real load.

+25 Years of team experience
6 PLC/VFD brands we integrate
100% Panels with documented FAT in our shop
24/7 Post-commissioning support
Applications

Types of projects we deliver

Every industry has its own particulars — we adapt the solution to your process

Water pumping and treatment

Water pumping and treatment

Pumping stations, wastewater treatment plants (WWTP) and sewage collection systems. Level, flow, pressure and pump alternation control with VLT AQUA Drive.

Ideal for

Municipalities · Drinking water · WWTP

Servo-driven machines

Servo-driven machines

Rewinders, converting and printing lines with synchronized Siemens SINAMICS S120 servo drives. Web tension, speed and positioning control.

Ideal for

Paper · Converting · Printing · Packaging

Industrial refrigeration and compressors

Industrial refrigeration and compressors

Automation of ammonia compressors, chillers and machine rooms. High-power VFDs with measured energy savings.

Ideal for

Refrigeration · Industrial HVAC · Process

Alcohol filtration and production

Alcohol filtration and production

Distilleries and alcohol filtration plants with controlled batch processes: dosing, temperature, level, residence times and batch traceability for consistent quality.

Ideal for

Distilleries · Spirits · Breweries · Food

Why automate with Beiton

Monitoring with DrivePulse Every drive we install is registered in DrivePulse — traceability, PM history and service-life forecasting.
In-house process engineering We do not just wire equipment together. We understand pumping, flow, pressure and servo control so we can design the right solution.
Lifetime support Genuine spare parts, official Danfoss DrivePro service, ongoing training and future modifications.
From your process to commissioning

How we execute a project

01

Process survey

We visit your plant, learn the process and document functional requirements and constraints.

02

Detailed engineering

P&ID, single-line diagrams, control logic, I/O lists and panel layouts — all signed off before anything is purchased.

03

Programming and configuration

Siemens TIA Portal PLC code, HMIs, Danfoss drive parameterization and industrial communications.

04

Panel and skid fabrication

Our shop builds the project's panels and skids. Documented FAT before shipping to site.

05

Installation and commissioning

On-site installation, SAT testing under real load, control loop optimization and process fine-tuning.

06

Handover and support

As-built documentation, program backups, operator training and post-commissioning support.

Portfolio

Real projects

Wastewater collection station — full modernization
Wastewater collection station — full modernization
Control panel on site after commissioning
Control panel on site after commissioning
Integrated panel — VFDs + PLC + remote I/O
Integrated panel — VFDs + PLC + remote I/O
Detail — VLT AQUA Drive, Siemens PLC and safety relay
Detail — VLT AQUA Drive, Siemens PLC and safety relay
Panel under construction in our shop
Panel under construction in our shop
I/O wiring detail and conductor marking
I/O wiring detail and conductor marking
// How we get started

Three steps and typical lead times

Typical lead times for a mid-sized project, for example a pumping station with 4 to 6 VFDs, a PLC and a basic SCADA. The proposal includes a schedule with milestones.

  1. 01 Typical time 1–2 weeks

    Site survey and proposal

    We visit your plant, document the process, the signals and the shutdown windows, and present scope, schedule and price.

  2. 02 Typical time Panels: 3–5 weeks

    Engineering, panels and FAT

    Detailed engineering, PLC and HMI programming and panel fabrication in our shop, with documented FAT before shipping.

  3. 03 Typical time Total: 10–14 weeks

    Installation and commissioning

    Installation, SAT with real load, operator training and as-built documentation. Large projects: 16 to 24 weeks.

If you are looking for an integrator for a complete project, see how we handle industrial automation in Panama.

If your PLC or your drives are no longer supported, the starting point is a migration of obsolete PLCs and control systems.

To complete the drive system we also supply industrial electric motors.

// FAQ

What clients ask before we start

Short answers to the questions that usually come up in the first technical conversation. Exact lead times are confirmed in the proposal.

Q01 How long does an automation project take?
A mid-sized project, such as a pumping station with 4 to 6 VFDs, a PLC and a basic SCADA, takes 10 to 14 weeks end to end. A large one, 16 to 24 weeks.
Q02 Can you work on an existing system?
Yes. If the PLC or the drives are obsolete, we plan a migration that reproduces the existing logic and minimizes process downtime.
Q03 Which brands do you work with?
Mainly Siemens PLCs and Danfoss drives, with instrumentation from the brands we represent. If your plant has its own standard, it is reviewed during engineering.
Q04 What is delivered at the end of the project?
FAT-tested panels, PLC and HMI programs with their backups, commissioning with real load, as-built documentation and operator training.

Do you have a process that needs automation?

Every plant is different. Tell us about your application and we will design the solution — from engineering through commissioning.