Process Design and Mechanical Engineering

We do not just automate: we design the whole process. From P&IDs to piping isometrics, and everything in between — hydraulic calculations, material selection, qualified welding (WPS/PQR) and mechanical erection supervision in the field. We tie the mechanical engineering to the electrical and control engineering so everything works as one system.

From P&ID to the field

The scope of our engineering

01

Process P&IDs

A complete representation of the process with instrumentation, valves, equipment and connecting lines. The basis for everything designed afterward.

02

Piping design and isometrics

Pipe routing, isometrics for fabrication, supports and stress calculations. Materials chosen for the fluid and the service conditions.

03

Hydraulic calculations

Line sizing, head losses and pump selection against the system curve, NPSH and operating conditions.

04

Material selection

Carbon steel, stainless steel, PVC, CPVC, HDPE — we select for chemical compatibility, temperature, pressure and the applicable code.

05

Qualified welding

Qualified procedures (WPS/PQR), certified welders, visual inspection and non-destructive testing when the project calls for it.

06

Erection supervision

On-site presence during mechanical erection. Verification of alignment, torque values, supports and hydrostatic testing.

07

As-built documentation

Final updated drawings and a quality dossier with material certificates, welding records and test protocols.

Portfolio

Engineering and erection

Pumping system installed
Systems being built in our shop
Piping and erection completed
// How we get started

Three steps and typical lead times

Lead times depend on the size of the process; these are typical for a pumping system or a mid-sized process line.

  1. 01 Typical time 1–2 weeks

    Survey and design basis

    A plant visit, fluid and operating data, space constraints and the code that applies to the project.

  2. 02 Typical time 2–6 weeks

    P&IDs, calculations and isometrics

    P&IDs, hydraulic calculations, pipe routing, isometrics and a bill of materials for approval.

  3. 03 Typical time Per site schedule

    Fabrication and erection supervision

    Welding to qualified procedures, field supervision, hydrostatic testing and an as-built dossier at closeout.

In treatment plants, process design goes hand in hand with wastewater treatment plant automation in Panama.

If the system can arrive prefabricated, see our pump skids.

// FAQ

What clients ask before we start

Short answers to the questions that usually come up in the first technical conversation. Exact lead times are confirmed in the proposal.

Q01 Can you do the engineering only, without execution?
Yes. We deliver the engineering package (P&IDs, isometrics, calculations and bill of materials) for your team or your contractor to execute.
Q02 Which piping materials do you work with?
Carbon steel, stainless steel, PVC, CPVC and HDPE, selected for chemical compatibility, temperature, pressure and the applicable code.
Q03 Is the welding qualified?
Yes: qualified procedures (WPS/PQR) and certified welders, with visual inspection and non-destructive testing when the project calls for it.

Do you need process engineering for your project?

From the P&ID through commissioning — a single team accountable for the mechanical and process engineering.