Migration of Control Systems

Plenty of plants still run controllers and variable frequency drives (VFDs) that are 15 to 20 years old, no longer supported and with no spare parts available. We handle the full migration: surveying the existing logic, porting it to a current platform, replacing obsolete equipment, updating the operator interfaces and testing exhaustively so your process keeps running with no surprises.

Warning signs

When is it time to migrate?

No spare parts available

The manufacturer no longer makes the control card or the I/O module you need. One failure means weeks of downtime waiting for a used spare.

No technical support

Nobody can program, troubleshoot or modify your PLC or VFD because the software is two decades old and can no longer be licensed.

Growing operational risk

Wear components (electrolytic capacitors, fans) have a finite service life. Over the years, the probability of failure rises and spare parts become scarce.

A need for new functionality

Your process has evolved but the controller cannot take more I/O, modern communications or new protection logic.

Methodology

How we execute a migration

01

Survey of the existing system

We document the PLC, I/O, HMI, VFDs and the existing control logic. If there are no drawings, we produce them.

02

Porting the control logic

We reproduce the original logic on the new platform. We do not reinvent your process — we migrate it faithfully and then optimize.

03

Selection of equivalent equipment

We map every obsolete component to its current equivalent. Danfoss VFDs, Siemens PLCs, compatible HMIs.

04

Panel retrofit

We build a new panel or adapt the existing one to take the new equipment. We keep mechanical changes to a minimum.

05

Phased migration

Where possible, we migrate section by section to reduce plant shutdown. Each phase is tested on its own.

06

Validation and documentation

SAT testing with the real process, parameter optimization, handover of as-built drawings, backups and training.

Portfolio

Migrations delivered

Paper machine migration — 13 Siemens SINAMICS S120 servo drives
Migrated panel with new equipment
Technician carrying out a migration
Upgraded control panel
// How we get started

Three steps and typical lead times

Lead times depend on the size of the system. These are typical for a line or station with one PLC and a few VFDs.

  1. 01 Typical time 1–2 weeks

    Survey of the current system

    We document the PLC, I/O, HMI, VFDs and logic on site. If drawings or backups are missing, we produce them.

  2. 02 Typical time 3–6 weeks

    Engineering and shop testing

    Logic reproduced on the new platform, a new or retrofitted panel and shop tests before anything is touched in the plant.

  3. 03 Typical time 4–8 h per stage

    Cutover in shutdown windows

    When the process allows it, we migrate section by section; each stage is tested with the real process before moving on to the next.

If you only need to replace drives without touching the PLC, see our retrofit of obsolete VFDs.

If the migration is part of a larger project, see our industrial automation in Panama.

// FAQ

What clients ask before we start

Short answers to the questions that usually come up in the first technical conversation. Exact lead times are confirmed in the proposal.

Q01 Does the whole plant have to stop for the migration?
Not necessarily. When the process allows it, the migration is done section by section in planned shutdown windows, and each stage is tested before moving on to the next.
Q02 What if there are no drawings or program backups?
The system is surveyed on site: we document the I/O, logic and parameters, and produce any missing drawings before migrating.
Q03 Does the migration change how the process runs?
The logic is first reproduced exactly as it runs today, so the process stays the same. Improvements are agreed with your team and implemented afterwards.
Q04 Do you also migrate the drives?
Yes. Obsolete drives are replaced with their current Danfoss equivalent, with the parameter set replicated; for Danfoss units, through DrivePro Retrofit.

Do you have obsolete equipment with no support?

We assess your current system and hand you a migration plan with scope, cost and schedule.